

façade1st enables a new way to build that reduces risk and accelerates delivery - eliminating the need for traditional perimeter safety systems.
Façade1st Benefits
​
Reduced Costs: Save up to 40% on project costs
Faster Construction: Get projects done up to 50% quicker
Simplified Process: Minimise on-site labour by up to 70%
Sustainable Construction: Achieve carbon negative during construction
ESG-Compliant: Meets Environmental, Social and Governance standards.
​
ELIMINATE
-
climbing perimeter screens
-
external scaffolding
-
temporary handrails
-
fall arrest protection
-
hoarding to protect public
-
external nets/protection
-
EWP or other access equipment
-
edge concrete formwork
-
drilling and installing brackets
-
cleaning of concrete stains on façade
-
up to 2.5m of perimeter concrete floor on each level
-
other contingent costs
REDUCE
-
crane use
-
double handling of façade
-
other temporary equipment
-
labour/management on site
-
traffic control/travel to site
-
on-site shed/accomodation
-
on-site storage space/parking
-
debris/waste on-site
-
project schedule and timetable
-
carbon emission
-
weather disruption
-
interests on money/funds
-
architect/engineer costs