Our patented method installs façade modules two floors above construction. As each floor is poured, these modules become the primary edge protection, eliminating the need for scaffolding or handrails.
​
The system always maintains at least one level of built-in edge protection — and that changes everything.

step 1
install 2 levels of façade1st modules

step 2
pour level 1 floor

repeat step 2
pour level 4 floor

step 1
install 2 levels of façade1st modules
1/8

manufactured
off-site to fit
any scale and architectural vision


ELIMINATE
-
PERIMETER SCREENS
-
SCAFFOLDING
-
FORMWORK
-
HANDRAILS
-
FALL ARREST PROTECTION
-
STORAGE OF FACADE
-
DOUBLE CRANE HANDLING OF FACADE
-
DELAYS
BUILDING TYPES
-
MULTI STORY CAR PARKS
-
BUILD TO RENT
-
HIGH/LOW RISE BUILDINGS
-
APARTMENTS/HOTELS
-
SCHOOLS
-
HOSPITALS
-
COMMERCIAL
-
INDUSTRIAL
-
CONCRETE/TIMBER BUILDINGS
-
SHOPPING CENTERS


ALL-IN-ONE MODULES
WINDOWS, HANDRAILS, PLUMBING, ELECTRICAL, IRRIGATED GREENERY.

DELIVERED AND READY FOR SWIFT INSTALLATION.
SUNDRY MATERIALS
PRE-LOADED
OPTIMIZING ON-SITE
EFFICIENCY.


INSTALLATION
OF
MODULES.
LIFTED DIRECTLY
OFF TRUCKS
INTO POSITION.