Façade1st reverses the sequence of current costly, high-risk and time consuming construction method.

​

The method requires the façade to be installed 2 floors above the last floor and remain on site as the permanent façade after construction.

​

During construction, the method enables the façade to act as a protective barrier eliminating the need for temporary works including screens, scaffolding and handrails.

OFF-SITE MANUFACTURING
ANY SIZE AND DESIGN

psabcp.jpg

ELIMINATE

  • PERIMETER SCREENS

  • SCAFFOLDING

  • FORMWORK

  • HANDRAILS

  • FALL ARREST PROTECTION

  • STORAGE OF FACADE

  • DOUBLE CRANE HANDLING OF FACADE

  • DELAYS

 BUILDING TYPES

  • MULTI STORY CAR PARKS

  • BUILD TO RENT

  • HIGH/LOW RISE BUILDINGS

  • APARTMENTS/HOTELS

  • SCHOOLS

  • HOSPITALS

  • COMMERCIAL

  • INDUSTRIAL

  • CONCRETE/TIMBER BUILDINGS

  • SHOPPING CENTERS

DSC05868vl24070272.jpg
aio01.jpg
ALL-IN-ONE MODULES

WINDOWS, HANDRAILS, PLUMBING, ELECTRICAL, IRRIGATED GREENERY.
aio02.jpg
DELIVERED AND READY FOR SWIFT INSTALLATION.

SUNDRY MATERIALS
PRE-LOADED
OPTIMIZING ON-SITE
EFFICIENCY.
aio03.jpg
aio03.jpg
INSTALLATION 
OF
MODULES.

LIFTED DIRECTLY
OFF TRUCKS
INTO POSITION.
preston yellow logo

CONTACT
US

Tel. +61-2-9748-4677

 info@prestonaustralia.com

​

VISIT
US

​Unit 19 Quantum Business Park

287 Victoria Road, 
Rydalmere, NSW 2116

Australia

​

Monday - Friday 9:00 - 3:00

TELL
US

Thanks for submitting!

bottom of page